Technical requirements for ctf25 pulley and pulley shaft processing production line:
1. Manual loading and unloading, and automatic interface shall be reserved.
2. Process: see the table below, and other reasonable schemes can also be put forward according to the drawings.
3. Beat: 20jph for the whole line.
4. Flexibility: compatible with driving pulley, driven pulley, and driving / driven pulley and pulley axle of other models.